Code tool

Motor catalogue selector

Compare your motor catalogue against declared mechanical and electrical requirements for every scenario.

In-browser processingNo account requiredPrivacy details ↗

User data only. P = torque × rpm × 2π/60; π = 3.141592653589793 and √3 = 1.7320508075688772 are declared approximations. Decimal unit conversions are exact rational operations. Missing ratings or requirements remain unknown.

No NEMA/IEC catalogue, service factor or efficiency is assumed. Regional standards, licensed current data and professional review are required for compliance approval. Inputs stay in this browser.

Schema: power W/kW/hp (mechanical hp = 745.69987158227022 W); torque and startTorque N·m/lbf·ft; rpm rpm/rad/s; voltage V/kV; current A/mA; frequency Hz; phase 1/3/DC; duty and environment exact strings. efficiency and powerFactor are fractions (0–1), only when supplied. Demand current is the permitted maximum. Other numeric demand fields are minimum ratings except voltage/frequency (equal), rpm (minimum, with optional maxRpm). Demand requires power or torque plus rpm, voltage, current, phase, frequency, duty, environment and startTorque for a complete screen. Extra fields are rejected.

Limits: each JSON input ≤200,000 characters; each list ≤200 rows; catalogue × scenarios ≤5,000 pairs; full report ≤4,000,000 characters. Exceeding any limit rejects the whole calculation without truncation.

A QUICK WALKTHROUGH

How to use this tool

  1. Enter your catalogue and source/edition; numeric quantities use {value, unit}.
  2. Enter all demand scenarios and choose the ranking field and direction.
  3. Calculate, inspect every pass/fail/unknown criterion and export the frozen report.

Scope and precision

User data only. P = torque × rpm × 2π/60; π = 3.141592653589793 and √3 = 1.7320508075688772 are declared approximations. Decimal unit conversions are exact rational operations. Missing ratings or requirements remain unknown. Limits: each JSON input ≤200,000 characters; each list ≤200 rows; catalogue × scenarios ≤5,000 pairs; full report ≤4,000,000 characters. Exceeding any limit rejects the whole calculation without truncation.

Selection boundary

No NEMA/IEC catalogue, service factor or efficiency is assumed. Regional standards, licensed current data and professional review are required for compliance approval. Inputs stay in this browser.

GOOD TO KNOW

Common questions

Can this approve a motor installation?

No. It compares supplied requirements and ratings, including all ties; it does not certify compliance.